Dugald River

site overview
Based in north-west Queensland, Dugald River is positioned on one of the worlds highest-grade zinc deposits.
Currently in the construction stages the mine is on track to be in production by 2018 and once operational, has estimated 170,000 tonnes of zinc in zinc conctrate, plus by products to be produced.
For more information on Dugald River mine please view the tabs above.
Information missing?
Let us know by filling in the Site Information Sheet: http://www.workedthere.com.au/site-information-sheet
Location Map
Site Facilities
Facility | Availability | Comments |
---|---|---|
Foxtel | ||
GYM | ||
Phone reception | ||
Public computer with internet access | ||
Swimming Pool | ||
TV Supplied | ||
Washing Facilities | ||
Wetmess | ||
WIFI Access |
Site Photos
This work site does not have any photos albums yet, please check back later.
Site Ratings
camp
Room
Food Quality
Lunches and Cribs
After Work Activities
site
Site Infrastructure
Quality of Machinery
Site Safety Level
Employee Training
people
Work Group
Sociability
Fitness/Support Networks
pay
Wages
Bonuses
Pay Reviews
Site Reviews
Nobody has posted a review of this site yet.
Not enough information about your site?
Please help us out by filling in the site information form.
Site information form